Optimal shift event placement

If the Find best matched work rule is enabled when adding or editing shift assignments, the system moves the associated shift events to optimal placements within the shift. This optimization is based on the FTE Differential status. However, it is done differently, depending on whether the shift event is a working or non-working shift event.

Working and non-working shift events

Working shift events are associated with activities that are considered work activities, but are not the main activities of the shift.

For example, a shift is associated with the activity, Phone. A working shift event can be associated with the activities Project or Research. An employee scheduled for this shift is mainly working on the phones, but during these working shift events, does a special project or research. For working shift events, the parameter, Use in Shift (Primary Activity), is selected for the activity of the shift event.

Non-working shift events are associated with activities that occur during a shift, but are not considered work activities. Common examples include breaks or lunches. For non-working shift events, the parameter, Use in Shift (Primary Activity), is not selected for the activity.

Optimal placement of shift events based on FTE Differential

When adding new or moving existing shift events, the system optimizes shift event placement based on the FTE Differential status.

The considerations are different, depending on whether the shift event is a working or non-working shift event:

  • The system attempts to place non-working shift events (like Break or Lunch) when the corresponding FTE Differential values are the highest (overstaffed periods). It still adheres to the shift event start and end time parameters and spacing rules. This feature ensures that service goals are still being met during time intervals where some employees are not working.

  • The system attempts to place working shift events (like Project or Research) when the corresponding FTE Differential values are the lowest (understaffed periods). It still adheres to the shift event start and end time parameters and spacing rules. This feature ensures that employees are still working when needed during a shift, even though they are not working on the main activity for the shift.

Create a shift event

Edit a shift event

Find best matched work rule