OT extension details
When creating or editing an OT extension, define or update data about the OT extension.
Field |
Description |
---|---|
Organization |
When creating OT extensions from the Work Administration module, this is a read-only field that displays the organization for which the OT extension is created (the selected organization). NOTE: This field only appears when creating OT extensions from the Work Administration module, under Work Rules. |
Campaign |
When creating OT extension exception from the Forecasting and Scheduling module, this is a read-only field that displays the campaign for which the OT extension is created. NOTE: This field only appears when creating OT extensions from the Forecasting and Scheduling module, under Work Rules. |
Name |
Defines the name of the OT extension. For example: 1.5-hr OT, 4-hr OT with Break |
Description |
Optional: Describes the OT extension. For example: 3-hour OT after the shift with a 15-minute break. |
Activity |
Defines the name of the activity of the OT extension. The drop-down list includes activities defined for the selected organization. |
Duration |
Defines the length of the OT extension in the time format, HH:MM. You can use the up and down arrows to set the duration, or you can type it directly into the Duration field. |
Minimum Gap |
Defines the minimum allowable time between the end or beginning of a shift and the OT extension. For example, you want employees to have at least a 1/2 hour gap between the end of a shift and their overtime extension. Type 00:30 in the Minimum Gap field. |
Maximum Gap |
Defines the maximum allowable time between the end or beginning of a shift and the OT extension. For example, you do not want employees to have more than an hour gap between their overtime extension and the beginning of a shift. Type 01:00 in the Maximum Gap field. |